How Long Does It Take to Build a Website?
A business owner sets a launch date for a new site, then watches it slip by weeks. The delay is rarely the developers’ speed. It is usually content that arrives late, feedback that takes days, and a feature added halfway through. Knowing what drives a website schedule lets you plan one that holds.
This guide gives typical timelines for three kinds of site, explains what moves them, and shows how the stages fit together.
How long does it take to build a website?
A website takes between 1 and 6 weeks for most business sites, depending on the type. At Digital Hub, a Shopify store typically takes 1 to 3 weeks, a WordPress site 2 to 4 weeks, and a custom website of up to 10 pages 4 to 6 weeks. These are normal ranges, not best cases.
| Type of site | Typical duration |
|---|---|
| Shopify store | 1 to 3 weeks |
| WordPress site | 2 to 4 weeks |
| Custom website, up to 10 pages | 4 to 6 weeks |
Scope moves all three. More pages, custom features and integrations make the work longer. A larger platform, such as a site with user accounts and payments, takes longer than any of the figures above.
Why do the three types take different amounts of time?
The types differ in how much has to be built from scratch.
A Shopify store starts from a hosted store platform, so the work goes into the catalog, the design and the settings. That is why it is the quickest.
A WordPress site starts from a content management system that lets editors manage pages without code. The work goes into design, templates and content structure. Digital Hub’s WordPress development page covers what this includes.
A custom website is built to a specific set of requirements, such as accounts, custom ordering or links to other systems. Digital Hub builds these in ASP.NET, Node.js, React and PHP. Nothing is inherited, so the build takes longer, and it can do things a template cannot.
What happens during a website project?
A website project follows the same sequence at any size. Digital Hub runs every project through the same seven steps: a discovery call, a proposal and scope, a milestone plan, building milestone by milestone, testing and handover, launch, and support after launch.
- The discovery call covers the project in detail, the budget and the timeline.
- The proposal and scope is written, so both sides know exactly what is being built.
- The milestone plan breaks the scope into milestones, each with its own deliverable and date.
- During the build, work is delivered one milestone at a time. Each milestone is reviewed and signed off before the next one starts, so nothing is discovered at the end.
- Testing and handover end with a walkthrough, so your own team can run the site.
- After launch, Digital Hub supports the site for one month on short projects and three months on long ones.
The timeline for a project is the sum of its milestones, and the dates are agreed up front.
What delays a website launch?
Most delays come from the client side of the schedule, and all of them are avoidable.
Content that arrives late
Text, photographs and product information are the most common cause of delay. A site cannot launch with placeholders. Gather the content early, and decide who is responsible for each piece.
Slow feedback
Each milestone waits for review and sign-off. If feedback takes a week, a project with eight milestones gains eight weeks. Agree a response time at the start and name one person who gives final approval.
Changes to scope
A feature added midway changes the milestones after it. Small additions are fine if the schedule is adjusted with them. Large ones are better held for a second release.
Integrations
Each connected service, such as a payment provider or an email system, needs connecting and testing. Decide early which ones are needed.
Unclear brand
A site built before the brand’s colors, typefaces and voice are settled is redesigned when they change. Settle the identity first. The article on brand guidelines explains what to settle.
How can you shorten a website schedule?
You can shorten a schedule by deciding the scope early and keeping to it.
- Write a clear brief. List the pages, the features and the systems the site must connect to.
- Prepare content in advance. Have text and images ready before design starts.
- Name one decision maker. Several approvers slow every milestone.
- Launch a focused first version. A smaller site that goes live can grow, and one waiting for every feature cannot.
- Choose the right platform. A store with a standard catalog suits Shopify. A content site that editors update often suits WordPress. A site with its own logic suits a custom build.
What is a real example of a longer website project?
A larger project shows how scope moves the schedule. For a chauffeur company in the UAE, a hacked WordPress site was replaced with a custom, secured site tied directly to the company’s payment and booking flow. The new site was built by another party on JavaScript and Laravel, and the build took 2 months. Digital Hub led the rebuild, specifying the structure and requirements, directing the work and overseeing delivery.
That is longer than the 4 to 6 weeks of a custom website of up to 10 pages. The site was tied to payments, bookings and portals for staff and drivers, which is the kind of scope that moves a timeline.
Who maintains the site afterward?
Decide this before launch. The site is handed over with a walkthrough, so your own team can run it, and Digital Hub supports it afterward for one month on short projects and three months on long ones. Longer cover is available as a retainer. Plan who updates content, who handles hosting and who fixes problems.
What should be ready before a website project starts?
A project moves faster when these are ready before design begins.
- A purpose and an audience. What the site must achieve, and for whom.
- A list of pages. Even a rough list shapes the scope.
- Content. The text, photographs and product information that will go on the pages.
- Brand assets. The logo files, colors, typefaces and tone of voice.
- Accounts. Access to the domain name and to the email addresses the site will use.
- A decision maker. One person who gives final approval at each milestone.
If some of these are missing, say so at the discovery call. They can be produced as part of the project, but they belong in the scope, and they add to the schedule.
How do WordPress and Shopify differ for a first site?
Choose by what the site must do. Shopify suits an online store with a standard catalog and checkout, and it gets a store live quickly. WordPress suits a content site that editors update often, such as a company site with pages, news and service descriptions.
A custom website suits a site with its own logic, such as accounts, custom ordering or connections to other systems. Each choice trades speed for control. The question to ask is not which is best, but which fits the requirements with the least work.
Is launch the end of a website project?
Launch is the start of the site’s working life. After the site goes live, someone needs to watch it, fix problems, keep software updated and add content. Digital Hub supports a site for one month after launch on short projects and three months on long ones, and longer cover is available as a retainer.
Security belongs in that plan. The chauffeur company’s site described above had been hacked twice before Digital Hub inherited it and recovered it both times. It was replaced with a custom, secured site. A site that is not looked after can become a liability, so decide who is responsible for it before launch.
What should a website contain at launch?
A site at launch needs only a few things done well: a clear statement of what the business does and who it is for, an easy way to get in touch, layouts that work on a phone, pages that load quickly, sensible titles and descriptions for search engines, and analytics so you can see what happens. Everything else can follow in later releases.
A focused launch also makes the schedule easier to keep. Features added after the site is live can be planned and signed off on their own milestones, without holding up the first release.
Can parts of a website project run in parallel?
Some parts can. Content can be written while the design is being drawn, and technical set-up such as domain and email accounts can happen alongside both. The build itself usually follows design sign-off, since changing a design after it is built costs time. Digital Hub’s milestone plan makes these dependencies visible, so you can see which tasks can overlap and which must wait.
Where do you start?
Start with the brief and the content. Describe the site you need, gather what goes on it, and choose the type of site that fits. If you want a quote and a timeline written for your scope, the custom website development page explains how Digital Hub works, and the Web Development page covers all three types.